Gas Vent Ridge Terminal
The Gas Vent Ridge Terminal can be used with:
There is also a separate Gas Vent Ridge Terminal available for use with Hardrow.
1. Remove a section of ridge batten or ridge board between the
two rafters or trusses where the Gas Vent Ridge terminal is to be
located. Timber noggins must be fitted between the rafters to
strengthen the roof prior to cutting through the ridge board.
2. Fix the extension box to the underside of the Gas Vent Ridge
terminal using the bolts and gasket provided.
Note: The extension box should be fitted prior
to the Gas Vent Ridge terminal being placed on the
roof.
A 125mm R-type adaptor is available to enable a gas duct to be
fitted to the Gas Vent Ridge terminal.
3. Felt and batten the roof in the normal manner. Lay top fillers
on the top course of slates or tiles.
Note: Non-vented top fillers must be fitted
under and for 600mm either side of a Gas Vent Ridge
terminal.
4. Fix ridge seals on both ends of the Gas Vent Ridge terminal and
place in the appropriate position. Lay subsequent ridge tiles,
working away from the Gas Vent Ridge terminal, that interlock by
slotting a ridge seal onto the end of each ridge unit at the
opposite end to the nail hole. Use block end ridges at gable
ends.
Note: If the ridge length does not work out to
full ridge tile lengths, then it will be necessary to cut the
ridges to suit. Do not cut the block end ridge.
5. Secure each ridge tile using an 80mm stainless steel ringed
shank nail and integral washer provided.
Note: For Hardrow Slates the Gas Vent Ridge
terminal is mortar bedded.