Case Study - Stepoc - Woodstock, Oxfordshire
| Project | New Build Property |
|---|---|
| Location | Woodstock, Oxfordshire |
| Product | Stepoc 256mm |
| Contractor | Malcolm Griffiths Renovations |
| Architect/Specifier | Malcolm Griffiths |
| Completion Date | 2006 |
Project Description:
This revolutionary building in Woodstock, Oxfordshire was completed in 2006 and work has already begun on a similar property to a larger scale.
The inner skin of the construction is 256mm Stepoc and this has then been insualted and faced with natural stone to match the local vernacular - this project is on the edge of Blenheim Palace's grounds. Completion on the second dwelling is scheduled for mid 2007.
Description: Completed Dwelling using Stepoc - Woodstock, Oxon
Description: Construction of 2nd dwelling - Stepoc 256
Description: Construction of 256 Stepoc at new dwelling, Woodstock, Oxon
Description: Construction of 256 Stepoc at new dwelling, Woodstock, Oxon
![[logo] Forticrete](gfx/logo_forticrete.gif)


![[logo] Forticrete](gfx/logo_forticrete_footer.gif)
![[logo] Fivesite](gfx/logo_fivesite.gif)
